


In management, enterprise management, mine practice contracted responsibility system of internal vigorously implement, establish and perfect the internal norm and the price system, strengthen the cost budget preparation and control, and actively promote internal 3 accounting, accounting, to shift into peoples heads, the source of cost control, comprehensive budget management fell into practice. 1-9 months, 93.18 cost of tons of coal mine, 4.62 lower than the budget of $6.58 year-on-year, reduce yuan, 38600 yuan, profit for the enterprises to improve 20016 earlier than the budget than last year, yuan RMB, the economic indicators 22356 period and the best level. Mine is pertinently caught electricity, fuel, explosive materials and the single sports expenditure on electricity, assessment: mine strict execution "hide peak and valley" power saving measures, 1-9 months of power consumption 10879.5 million degrees, which accounts for peak power 27.35%, flat 40.78% accounts for power, electricity 31.87% accounts for valley, compared with the equilibrium price lower electricity, 0.0159 yuan/degrees, save electricity 173 million yuan, In the management of fuel consumption, they give the odometers equipment installation, large hours and movable equipment according to actual odometers hours and engine test, oil and petrol hours hundred kilometres. Rigorously tested, section, super award effectively control the running, leakage phenomenon, with heavy vehicles, for example: 1-9 months, 91 tons of consumption 0.304 for car / / cubic kilometers of, year-on-year, reduce 0.008 litres/m3, save costs 40 million yuan, km, 68 tons of consumption 0.308 for car / / cubic kilometers of, year-on-year, reduce 0.02 litres/m3, and save cost 34.5 million kilometers, In the material cost management, production, every month according to mine maintenance plan monthly cost of materials and methods for evaluation, 1-9 months, 7962 yuan, mine material expenses cost per unit 12.36 yuan/ton, early than 8162 yuan, the unit cost budget 17.44 yuan/ton drop 4.62 yuan/ton, material cost 200 million yuan, To strengthen the new and old brought into managment system work, 1-9 months old, repair 2459 roller, save money, with 98 million new MDX bucket teeth value 22.04 yuan, repair scrap hydrophobic form roller, value and RMB 100, In the use of gunpowder, specially designated management in a mine mining technicians responsible in work, optimize blasting parameters, the wear under the premise of blasting effect, find out the most suitable for the geological conditions of the pore network parameters and charging structure and initiating way. 1-9 months, stripping blasting explosive consumption for 0.218 kilograms/stere, lower than the year 0.031 kilograms/stere, 95 million save cost.
Author: Dongyang City Yate Precision Casting Co., Ltd
website: www.zjinyate.net
main product: bucket teeth
